Dumarey Green Power is proud to announce the deployment of two Revolution Batteries with Select Plant Hire this July, with a further three scheduled to arrive in Q3 2025—marking a major step forward in our shared mission to deliver smarter, cleaner power solutions to the construction industry.
As part of our strong, long-standing partnership with Select, we’re proud that they are now the first UK customer to integrate all three of Dumarey’s innovative energy products into their offering. The addition of the Revolution Battery further strengthens Select’s ability to provide high-performance, low-emission power solutions tailored to the evolving needs of modern construction sites.
The Revolution Battery is purpose-built for applications requiring short bursts of high peak power—such as tower cranes and hoists—while maintaining low average energy consumption. With a compact design delivering 300kW of peak power from just 28kWh of capacity, it drastically reduces the number of battery cells needed—minimising embedded emissions and reducing the system footprint on-site.
A single Revolution Battery can power a CTL1600-66 tower crane, eliminating the need for an 800kVA generator by using only a standard 32A mains supply or a 40kVA generator. This simplified setup significantly reduces fuel use and emissions, while streamlining logistics and installation. In practice, it can save 3,000 litres of diesel, 7,920kg of CO₂e, and approximately £4,200 per week—a compelling environmental and economic win for clients.
Built in the UK, using local labour and supply chains, the Revolution Battery supports domestic manufacturing and minimises transport-related emissions. Designed with full lifecycle impact in mind, it offers sustainability not just in use, but throughout its entire journey.
It also includes automated reporting tools, allowing real-time monitoring of fuel savings and emission reductions—empowering users to meet their sustainability goals with confidence and transparency.
With the first two units arriving in July, the Revolution Battery is a powerful addition to Select’s growing fleet of sustainable power solutions, and a testament to the impact of our continued collaboration.
James Waller, Power Solutions Business Stream Leader, Select Plant Hire, said:
“The arrival of the Revolution Batteries is a key step in our drive for cleaner, smarter power solutions. Our ongoing partnership with Dumarey Green Power continues to deliver practical innovations that help us, and our clients meet real-world sustainability goals without compromising performance.”
Jon Drakeley, Product Director, Dumarey Green Power, added:
“We are proud to expand our collaboration with Select Plant Hire to include also the Revolution Battery. The team at Select are a long-standing partner who share our commitment to sustainability and innovation. The Revolution Battery demonstrates how smart, high-performance energy solutions can transform the way power is delivered on construction sites, cutting emissions without compromising on output.”